Constraint Removal and Work Plan Reliability: A Bridge Project Case Study

Constraint Removal and Work Plan Reliability: A Bridge Project Case Study
复制标题

DOI:
10.24928/2018/0510
复制
发表时间:
2018-07
期刊:
26th Annual Conference of the International Group for Lean Construction
影响因子:
--
通讯作者:
Ashtad Javanmardi;S. A. Abbasian-Hosseini;S. Hsiang;Min Liu
Ashtad Javanmardi;S. A. Abbasian-Hosseini;S. Hsiang;Min Liu
中科院分区:
其他
文献类型:
--
作者:
Ashtad Javanmardi;S. A. Abbasian-Hosseini;S. Hsiang;Min Liu

文献摘要

被引文献

相似文献