Spatial scheduling for shape-changing mega-blocks in a shipbuilding company

Spatial scheduling for shape-changing mega-blocks in a shipbuilding company
复制标题

DOI:
10.1080/00207543.2010.535863
复制
发表时间:
2011-02
影响因子:
9.2
通讯作者:
Shie-Gheun Koh;R. Logendran;Dae-Won Choi;Sang-Bok Woo
Shie-Gheun Koh;R. Logendran;Dae-Won Choi;Sang-Bok Woo
中科院分区:
工程技术2区
文献类型:
--
作者:
Shie-Gheun Koh;R. Logendran;Dae-Won Choi;Sang-Bok Woo

文献摘要

被引文献

相似文献

To overcome space restriction and to increase productivity, some shipbuilding companies use floating-docks on the sea instead of dry-docks on the land. In that case, a floating-crane that is capable of lifting very heavy objects (up to 3600 tons) is used to handle the blocks which are the basic units in shipbuilding processes, and therefore, very large blocks (also called mega-blocks) can be used to build a ship, but because there are some positional restrictions under which the mega-block assembly yard can be constructed, the space is the scarcest resource in the process. The focus of the research reported in this paper is to develop an efficient spatial schedule for the mega-block assembly yard. First, we develop a length-time two-dimensional packing model for this problem. Since the optimisation model cannot be solved using an analytical method, we propose a GA-based heuristic algorithm using computational geometry theory. Through performing a series of computational experiments, we finally show that the proposed spatial scheduling algorithm can provide solutions of good quality very efficiently.