Application of BP-ANN in Forecasting the Equivalent Radon Exhalation Rate of Uranium Ore-Rock in the Course of Mine Ventilation

Application of BP-ANN in Forecasting the Equivalent Radon Exhalation Rate of Uranium Ore-Rock in the Course of Mine Ventilation
复制标题

DOI:
10.1109/cise.2009.5366769
复制
发表时间:
2009-12
期刊:
2009 International Conference on Computational Intelligence and Software Engineering
影响因子:
--
通讯作者:
Y. Ye;D. Ding;Xiangyang Li;Xinhuo Zhou;Yangtong Tan
Y. Ye;D. Ding;Xiangyang Li;Xinhuo Zhou;Yangtong Tan
中科院分区:
其他
文献类型:
--
作者:
Y. Ye;D. Ding;Xiangyang Li;Xinhuo Zhou;Yangtong Tan

文献摘要

被引文献

相似文献

矿井通风过程中铀矿岩的放氡过程是一个复杂的非线性动力系统。鉴于BP-ANN处理复杂非线性函数的能力,以通风量和风压为BP-ANN预测模型的输入向量,以当量氡释放量为输入向量,建立了基于BP-ANN的矿井通风过程中铀矿岩当量氡释放量预测模型。将预测结果与非线性回归预测模型进行了比较,结果表明BP- ANN预测模型具有较高的预测精度。用该方法预测铀矿岩的当量氡析出率是可行的。
The process of radon exhalation of uranium ore-rock in the course of mine ventilation is a complex nonlinear dynamic system. In view of the ability of BP-ANN in dealing with the complex nonlinear function, taking the ventilation air quantity and wind pressure as the input vectors of the BP-ANN forecasting model, and the equivalent radon exhalation rate as the input vector, the paper established a predicting model of the equivalent radon exhalation rate of uranium ore-rock in the course of mine ventilation based on BP-ANN. The forecasting results are compared with that of the nonlinear regressive forecasting mode, which shows that the forecasting model of BP- ANN has higher predicting precission. It is feasible to forecast the equivalent radon exhalation rate of uranium ore-rock by the method.