Construction and initial operation of the Advanced Toroidal Facility

Construction and initial operation of the Advanced Toroidal Facility
复制标题

先进环形设施的建设和初步运行

DOI:
10.2172/5463576
复制
发表时间:
1990
期刊:
影响因子:
--
通讯作者:
W. Wing
W. Wing
中科院分区:
--
文献类型:
--
作者:
J. Lyon;G. Bell;J. D. Bell;R. Benson;T. Bigelow;K. K. Chipley;R. Colchin;M. Cole;E. C. Crume;J. Dunlap;A. England;J. Glowienka;R. Goulding;J. Harris;D. Hillis;S. Hiroe;L. Horton;H. Howe;R. Isler;T. Jernigan;R. L. Johnson;R. Langley;M. Menon;P. Mioduszewski;R. Morris;M. Murakami;G. Neilson;B. Nelson;D. Rasmussen;J. Rome;M. Saltmarsh;P. B. Thompson;M. Wade;J. A. White;T. White;J. Whitson;J. Wilgen;W. Wing

文献摘要

被引文献

相似文献

先进环形设施(ATF)扭转加速器的设计是在物理基础上进入第二稳定制度和工程基础上独立制造的高精度组件。ATF的实际结构、装配和初始运行与ATF设计过程中预期的特性进行了比较。参考文献31篇,图19,2个标签。
The Advanced Toroidal Facility (ATF) torsatron was designed on a physics basis for access to the second stability regime and on an engineering basis for independent fabrication of high-accuracy components. The actual construction, assembly, and initial operation of ATF are compared with the characteristics expected during the design of ATF. 31 refs., 19 figs., 2 tabs.