Scheduling jobs with chain precedence constraints and deteriorating jobs
Scheduling jobs with chain precedence constraints and deteriorating jobs
复制标题
DOI:
10.1057/jors.2010.120
复制
发表时间:
2011-09
影响因子:
3.6
通讯作者:
Ji-Bo Wang;Jian-Ji Wang;P. Ji
中科院分区:
文献类型:
--
作者:
Ji-Bo Wang;Jian-Ji Wang;P. Ji
In this paper we consider a single machine scheduling problem with deteriorating jobs. By deteriorating jobs, we mean that the processing time of a job is a simple linear function of its execution starting time. For the jobs with chain precedence constraints, we prove that the weighted sum of squared completion times minimization problem with strong chains and weak chains can be solved in polynomial time, respectively.