R&D of a 500 m superconducting cable in Japan

R&D of a 500 m superconducting cable in Japan
复制标题

右

DOI:
10.1109/tasc.2003.812973
复制
发表时间:
2003
影响因子:
1.8
通讯作者:
S. Akita
S. Akita
中科院分区:
物理与天体物理3区
文献类型:
--
作者:
K. Ueda;O. Tsukamoto;S. Nagaya;H. Kimura;S. Akita

文献摘要

被引文献

相似文献

Super-ACE项目于2000财政年度开始研究和开发超导交流电力设备作为国家项目。本项目是高温超导电缆、高温超导故障限流器、高温超导电抗器磁体和高温超导Transformer的基础技术研究与开发。该电缆的主要课题是额定电流为3 kA的高温超导导体的研制,额定电流为700 A的500 m高温超导电缆的冷却技术,以及高温超导电力系统的综合分析。本文介绍了该项目的背景、目标、主要研究成果和500 m电缆的试验计划。
Super-ACE project started to research and develop the superconducting AC power equipment as a national project in 2000 fiscal year. This project is R&D of the basic technologies of high temperature superconducting (HTS) cable, HTS fault current limiter (FCL), HTS magnet for reactor and transformer. Main subjects of the cable are to develop an HTS conductor rated 3 kA, cooling technology of a 500 m HTS cable of 700 A rated current, and the analysis of integrated HTS power system. The paper describes the background of this project, its target, major results of studies, and testing schedule of 500 m cable.