A framework for operationalizing the assessment of post-earthquake functional recovery of buildings

A framework for operationalizing the assessment of post-earthquake functional recovery of buildings
复制标题

建筑物震后功能恢复评估实施框架

DOI:
10.1177/87552930221081538
复制
发表时间:
2022
期刊:
影响因子:
5
通讯作者:
M. Koliou
M. Koliou
中科院分区:
工程技术2区
文献类型:
--
作者:
D. Cook;A. Liel;C. Haselton;M. Koliou

文献摘要

被引文献

相似文献

地震或其他灾害事件后的建筑物损坏可能会中断业务,使家庭流离失所,并严重扰乱社区多年。因此,政策制定者和工程师正在努力制定新的设计准则和政策,通过改善建筑功能恢复性能来减少建筑环境的脆弱性。本研究提出了一种方法,用于评估地震后的建筑性能状态的功能和reoccupancy内的建筑性能为基础的地震工程,针对美国的建设,利用联邦应急管理局(FEMA)P-58脆弱性和后果模型。这是通过将组件损坏状态映射到系统级操作性能,然后通过一系列故障树映射到建筑物级性能状态来实现的。该研究还提出了一种修复调度算法,以估计所需的时间来恢复建筑物的占用或功能,考虑阻碍因素,延迟开始维修。其结果是一个概率的方法,扩展了基于性能的工程框架,明确量化震后建筑功能的性能状态,从而促进设计和缓解决策的恢复为基础的性能目标。
Building damage after an earthquake, or other hazard event, can interrupt businesses, displace households, and significantly disrupt a community for years. As a result, policymakers and engineers are working toward new design guidelines and policies that reduce the vulnerability of the built environment through improved building functional recovery performance. This study proposes a method for assessing post-earthquake building performance states of function and reoccupancy within the architecture of performance-based earthquake engineering, targeted at US construction, making use of Federal Emergency Management Agency (FEMA) P-58 fragility and consequence models. This is accomplished by mapping component damage states to systems-level operational performance, and then to building-level performance states, through a series of fault trees. The study also proposes a repair scheduling algorithm to estimate the time taken to restore building reoccupancy or function, considering impeding factors that delay the start of repairs. The result is a probabilistic approach that extends the performance-based engineering framework to explicitly quantify post-earthquake building function performance states, thus facilitating design and mitigation decisions for recovery-based performance objectives.