Phase shifter placement in large-scale systems via mixed integer linear programming
Phase shifter placement in large-scale systems via mixed integer linear programming
复制标题
通过混合整数线性规划在大型系统中放置移相器
DOI:
10.1109/tpwrs.2003.814858
复制
发表时间:
2003
影响因子:
6.6
通讯作者:
J. Muñoz
中科院分区:
文献类型:
--
作者:
F. Lima;F. Galiana;I. Kockar;J. Muñoz
This paper makes use of advances in mixed integer linear programming (MILP) to conduct a preliminary design study on the combinatorial optimal placement of thyristor controlled phase shifter transformers (TCPSTs) in large-scale power systems. The procedure finds the number, network location, and settings of phase shifters that maximize system loadability under the DC load flow model, subject to limits on the installation investment or total number of TCPSTs. It also accounts for active flow and generation limits, and phase shifter constraints. Simulation results are presented for the IEEE 24-, 118-, and 300-bus systems, as well as a 904-bus network. The principal characteristics of our approach are compared with those of other published flexible AC system transmission (FACTS) allocation methods.