Hiroshi Takata: "Development of the Calculating Method for the Loads of Water Consumption in the Office Buildings"Proceedings of the CIB-W62 International Symposium on Water Supply and Drainage for Buildings. 249-264 (2003)
Hiroshi Takata: "Development of the Calculating Method for the Loads of Water Consumption in the Office Buildings"Proceedings of the CIB-W62 International Symposium on Water Supply and Drainage for Buildings. 249-264 (2003)
复制标题
高田博:《办公楼用水负荷计算方法的开发》CIB-W62国际建筑给排水研讨会论文集。
DOI:
--
复制
发表时间:
--
期刊:
影响因子:
--
通讯作者:
中科院分区:
文献类型:
--
作者: