Dynamic mobile RFID-based supply chain control and management system in construction

Dynamic mobile RFID-based supply chain control and management system in construction
复制标题

DOI:
10.1016/j.aei.2006.09.003
复制
发表时间:
2007-10
期刊:
Adv. Eng. Informatics
影响因子:
--
通讯作者:
Lung-Chuang Wang;Yu-Cheng Lin;P. Lin
Lung-Chuang Wang;Yu-Cheng Lin;P. Lin
中科院分区:
其他
文献类型:
--
作者:
Lung-Chuang Wang;Yu-Cheng Lin;P. Lin

文献摘要

被引文献

相似文献

施工项目控制试图通过项目参与方的信息共享和分析,有效地获取实时信息,增强动态控制和管理,以减少施工冲突和项目延误。然而,将建筑项目控制系统扩展到工地被认为效率低下,因为建筑工地是非常规做法。集成射频识别(RFID)技术、移动设备-PDA和门户网站等信息技术有助于提高建筑供应链控制系统中信息流的有效性和便利性。射频识别适用于各种建筑应用,并通过提高数据输入的速度和准确性来节省成本。本研究展示了一种基于RFID的供应链管理应用--基于移动建筑RFID的动态供应链管理系统(M-ConRDSCM)在建筑项目中的有效性,证明了它在建筑供应链环境下能够有效地响应并增强办公室和工地之间的信息流。然后,将M-ConRDSCM系统应用于台湾一座高科技厂房的案例研究,以验证所提出的方法,并展示在施工阶段项目控制的信息共享的有效性。M-ConRDSCM系统的优势不仅在于提高了现场工程师的工作效率,还在于提供了动态的运行控制和管理,使项目参与者能够控制整个项目。此外,本研究还提出了一种通用的系统架构及其实现。
Construction project control attempts to effectively obtain real-time information and enhance dynamic control and management via information sharing and analysis from involved participants of the projects to reduce construction conflicts and project delay. However, extending the construction project control system to job sites is considered inefficient since construction sites are unconventional practice. Integrating promising information technologies such as radio frequency identification (RFID) technology, mobile devices-PDA and web portals can help improve the effectiveness and convenience of information flow in construction supply chain control systems. Radio frequency identification is appropriate for various construction applications, and provides cost savings through increased speed and accuracy of data entry. This study demonstrates the effectiveness of a RFID-based supply chain management application called the mobile construction RFID-based dynamic supply chain management (M-ConRDSCM) system in construction projects, demonstrating that it responds efficiently and enhances the information flow among offices and sites in a construction supply chain environment. The M-ConRDSCM system is then applied to a selected case study involving a High-Tech factory building in Taiwan to verify the proposed methodology and demonstrate the effectiveness of information sharing of project control in the construction phase. The advantage of the M-ConRDSCM system lies not only in improving work efficiency for on-site engineers, but also in providing dynamic operation control and management to enable project participants to control the whole project. Moreover, this study presents a generic system architecture and its implementation.