Reconstruction in Japan
Reconstruction in Japan
复制标题
日本重建
DOI:
10.1080/01944365208979113
复制
发表时间:
1952
影响因子:
5.6
通讯作者:
H. E. Wildes
中科院分区:
文献类型:
--
作者:
H. E. Wildes
On the very day Japan surrendered, August 15, 1945, Tokyo municipal authorities began drafting plans for reconstruction. The task was stupendous. Of the 122,500 urban acres devastated by air-raids and fires about a third, 37,500 acres, lay within metropolitan Tokyo. Of 4,447,241 dwelling houses in the urban centers, a number insufficient to prevent a cruel and dangerous congestion (2,259,879) had been destroyed, together with 600,000 more pulled down to open firebreaks that would save the rest. Of these Tokyo itself had lost 569,068. Much has been heard of the atom bomb but Hiroshima, scene of that spectacular destruction, stood but seventh in the total loss of housing. Tokyo’s loss was nine times that of Hiroshima, Osaka’s six times as great. Other cities fared even worse. Nagoya, a larger center than Hiroshima, was 89 percent destroyed. Hammamatsu retained but 3,740 of its 32,500 houses, Hidachi only 846 out of 16,900, Kofu 2,901 of 18,099 and Fukuyama but 1,344 out of 10,154. No less than 8,995,000 persons were homeless. In Tokyo and Yokohama, in Fukui and Nagasaki, in every major city of Japan, bombed-out men and women and their children crowded into dug-outs, into flimsy shacks or camped out in railway stations. Subway platforms, where they existed, were preferred refuges. Employes slept in their offices, teachers in their schools. Those fortunate enough to retain their houses were overrun by relatives and friends, even by strangers seeking and securing shelter.Government officials, well drilled in earthquake, fire and flood disasters, moved quickly to restore such order as was ‘possible. Luckily, the late summer season, while rainy, obviated any immediate need for defense against cold weather but rebuilding of houses, restoration of water systems and repair of transportation facilities were paramount necessities. As elsewhere in Japan, Tokyo’s planners recognized their opportunity to modernize the city. The reconstruction council of August 15, 1945 decided upon fireproofing and zoning, upon decentralization of shopping and amusement areas, upon creation of cultural centers, of parks, of green-areas and upon beautification of river banks. Optimism was unbounded. Plans then proposed and soon adopted called for the building of 808 miles of new main highway, much of it to be 300 yards in width, and of high speed subways to replace elevated lines and surface trolleys. Some 6,000 bridges were to be replaced in Tokyo city, ten square miles of lowland slum district would be filled and graded and 7,350 acres of Tokyo would become a greenbelt reserve.