On engineering-geological studies concerning the selection of the course of the water tunnel Hausjärvi-Helsinki

On engineering-geological studies concerning the selection of the course of the water tunnel Hausjärvi-Helsinki
复制标题

DOI:
10.1016/0013-7952(67)90005-1
复制
发表时间:
1967-04
影响因子:
7.4
通讯作者:
H. Niini
H. Niini
中科院分区:
地球科学1区
文献类型:
--
作者:
H. Niini

文献摘要

被引文献

相似文献

根据工程地质研究选择最有利的隧道路线。这些研究的目的,是预测在其他隧道路线中,岩石情况对隧道爆破的影响、衬砌的数量、隧道支洞的位置和深度,以及在隧道建造前仍须进行的确定性实地研究的范围。研究的经济效益可估计为隧道掘进总成本的相当大的百分比。
Selection of the most favourable course of the tunnel is carried out on the basis of engineering-geological studies. These aim to predict, in the alternative tunnel courses, the influence of the rock conditions on tunnel blasting, the amount of lining, the site and depth of the adits to the tunnel and the extent of the definitive field studies still to be done before the construction of the tunnel. The economic benefit from the studies can be estimated as a considerable percentage of the total cost of the tunnel driving.