A sliding time window heuristic for open pit mine block sequencing

A sliding time window heuristic for open pit mine block sequencing
复制标题

DOI:
10.1007/s11590-011-0306-2
复制
发表时间:
2011-08-01
影响因子:
1.6
通讯作者:
Newman, Alexandra
Newman, Alexandra
中科院分区:
数学4区
文献类型:
--
作者:
Cullenbine, Christopher;Wood, R. Kevin;Newman, Alexandra

文献摘要

被引文献

相似文献

The open pit mine block sequencing problem (OPBS) seeks a discretetime production schedule that maximizes the net present value of the orebody extracted from an open-pit mine. This integer program (IP) discretizes the mine's volume into blocks, imposes precedence constraints between blocks, and limits resource consumption in each time period. We develop a "sliding time window heuristic" to solve this IP approximately. The heuristic recursively defines, solves and partially fixes an approximating model having: (i) fixed variables in early time periods, (ii) an exact submodel defined over a "window" of middle time periods, and (iii) a relaxed submodel in later time periods. The heuristic produces near-optimal solutions (typically within 2% of optimality) for model instances that standard optimization software fails to solve. Furthermore, it produces these solutions quickly, even though our OPBS model enforces standard upper-bounding constraints on resource consumption along with less standard, but important, lower-bounding constraints.