A Proposal of a Job Shop Scheduling Method for Solving Resources Contention Problems and its Verification
A Proposal of a Job Shop Scheduling Method for Solving Resources Contention Problems and its Verification
复制标题
一种解决资源竞争问题的作业车间调度方法的提出及其验证
DOI:
10.1541/ieejias.121.14
复制
发表时间:
2001
影响因子:
--
通讯作者:
T. Takahara
中科院分区:
文献类型:
--
作者:
H. Sugihara;H. Koizumi;N. Kataoka;T. Takahara
We propose CSM (Concurrent Scheduling Method) for the manufacturing site management in the job shop production. CSM aims to complete all the orders keeping the delivery date. In CSM, processing procedure is expressed in the CSM's Process-Chart similar to the PERT chart. The Process-Chart consists of Job-boxes and 2 kinds of Connectors, Connectors-in-the-order and Connectors-in-the-resources. Job-boxes and Connectors-in-the-order show a procedures of an order. Job-boxes and Connectors-in-the-resources show load orders of a resource. Using the Process-Charts, we can see huge information, changing hour by hour. A plan is made reflecting these information, and this plan achieves the flow of the best processing on the manufacturing site.