Optimisation of heat exchanger network cleaning schedules: Incorporating uncertainty in fouling and cleaning model parameters

Optimisation of heat exchanger network cleaning schedules: Incorporating uncertainty in fouling and cleaning model parameters
复制标题

换热器网络清洁计划的优化:纳入结垢和清洁模型参数的不确定性

DOI:
10.1016/j.compchemeng.2018.11.009
复制
发表时间:
2019
影响因子:
4.3
通讯作者:
Al Ismaili R
Al Ismaili R
中科院分区:
工程技术2区
文献类型:
--
作者:
Al Ismaili R

文献摘要

参考文献

被引文献

相似文献

The optimisation of the cleaning schedule in heat exchanger networks (HENs) subject to fouling is presented in which the impact of parametric uncertainty is considered. This work is based on the realisation that these HEN cleaning scheduling problems are multistage mixed-integer optimal control problems (MIOCPs) in which the controls, i.e. cleaning actions, exhibit bang-bang behaviour as they occur linearly in the system equations. A multiple scenario feasible path MIOCP approach is proposed, whereby many scenarios of the HEN multiperiod problems are stacked, sharing the same control actions. This is implemented on a 10 unit and a 25 unit HEN case studies representing crude oil refinery preheat trains (PHTs). Results show that there is a large difference in financial performance for the deterministic caseversusthe parametric uncertainty problem and hence it is vital that uncertainty be taken into account during the optimisation of schedules for HEN maintenance problems.
优化研究—V.:间歇式反应器的联动控制
DOI: 10.1016/0009-2509(62)80052-9
发表时间: 1962
影响因子: 4.7
作者:
N. Blakemore;R. Aris
通讯作者: R. Aris
速率下降过程的最佳循环
DOI: 10.1002/cjce.5450590512
发表时间: 1981
影响因子: 2.1
作者:
R. Ma;N. Epstein
通讯作者: N. Epstein
DOI: 10.1016/j.amc.2016.04.028
发表时间: 2016-09-05
影响因子: 4
作者:
Alt, Walter;Schneider, Christopher;Seydenschwanz, Martin
通讯作者: Seydenschwanz, Martin
DOI: 10.1021/ie034178g
发表时间: 2004-07-07
影响因子: 4.2
作者:
Lavaja, JH;Bagajewicz, MJ
通讯作者: Bagajewicz, MJ
热交换器对数据不确定性响应的随机建模
DOI: 10.1016/s0307-904x(01)00082-8
发表时间: 2002
影响因子: 5
作者:
R. Prasad;Karmeshu;K. Bharadwaj
通讯作者: K. Bharadwaj