The modeling of open pit mine schedules employing continuous functions [1] yields several difficulties regarding the optimization process. Besides the dynamic capacity constraint one of the most challenging problems is a proper way of ensuring the physical stability of the obtained profile functions of an excavation schedule. This paper shows, that under certain suitable assumptions the physically stable excavation path is the solution of a certain Hamilton Jacobi equation. (© 2013 Wiley‐VCH Verlag GmbH & Co. KGaA, Weinheim)