Performance of the beam collimation system in the J-PARC RCS (The 12th International Conference on Radiation Shielding (ICRS-12) and the 17th Topical Meeting of the Radiation Protection and Shielding Division of ANS (RPSD-2012)) -- (Accelerator Facilities)
Performance of the beam collimation system in the J-PARC RCS (The 12th International Conference on Radiation Shielding (ICRS-12) and the 17th Topical Meeting of the Radiation Protection and Shielding Division of ANS (RPSD-2012)) -- (Accelerator Facilities)
复制标题
J-PARC RCS中光束准直系统的性能(第12届国际辐射屏蔽会议(ICRS-12)和第17届ANS辐射防护与屏蔽分部专题会议(RPSD-2012))--(加速器设施
DOI:
10.15669/pnst.4.243
复制
发表时间:
2014
期刊:
影响因子:
--
通讯作者:
M. Kinshoa
中科院分区:
文献类型:
--
作者:
K. Yamamotoa;Shinichi Katob;H. HaradaA;Masahiro Yoshimotoa;Yoshio Yamazakia;Naoki Hayashia;Pranab Kumar Sahaa;Hideaki Hotchia;M. Kinshoa
The most important issue in a high intensity proton accelerator is to keep the accelerator tunnel in a hands-on-maintenance condition. A collimation system was designed and installed in 3GeV Rapid Cycling Synchrotron (RCS) at the Japan Proton Accelerator Research Complex (J-PARC) to be localized the beam loss point to a restricted area. The experimental results indicated that the RCS collimation system performs well enough such that nearly all the ring components are maintained in good condition. However, as the beam power increased, unexpected losses downstream of the injection foil increased. Therefore, an additional collimator was installed that successfully reduced such unexpected losses.
DOI:
--
发表时间:
2006
期刊:
Proceegings of the 3^<rd> annual meeting of particle accelerator society of Japan and the 31^<th> Linear accelerator meeting in Japan 1
影响因子:
--
作者:
S.Lee;et al.
通讯作者:
et al.
DOI:
--
发表时间:
2009
期刊:
Phys. Rev. 12
影响因子:
--
作者:
H. Hotchi;M. Kinsho;K. Hasegawa;N. Hayashi;Y. Hikichi;S. Hiroki;J. Kamiya;K. Kanazawa;M. Kawase;F. Noda;M. Nomura;N. Ogiwara;R. Saeki;P.K. Saha;A. Schnase;Y. Shobuda;T. Shimada;K. Suganuma;H. Suzuki;H. Takahashi;T. Takayanagi;O. Taked
通讯作者:
O. Taked