A Branch-and-Bound Algorithm for the Continuous-Process Job-Shop Scheduling Problem
A Branch-and-Bound Algorithm for the Continuous-Process Job-Shop Scheduling Problem
复制标题
连续过程作业车间调度问题的分支定界算法
DOI:
--
复制
发表时间:
1970
期刊:
影响因子:
--
通讯作者:
Richard Jean
中科院分区:
文献类型:
--
作者:
Bozoki George;Richard Jean
Abstract The continuous-process job-shop scheduling problem (CPJS) arises typically in the following way: (1) a set of M machines or production facilities are available; (2) a set of N jobs are to be processed through these machines in accordance with a technological matrix; (3) the machines associated with a given job must all be used simultaneously for the completion of this job; (4) a predetermined production time is required for each job; (5) the objective is to determine a production schedule which minimizes the total completion time (makespan) of all jobs. A branch-and-bound type algorithm for the solution of the (CPJS) problem is presented.