Operational Status of PF-Ring and PF-AR after the Earthquake
Operational Status of PF-Ring and PF-AR after the Earthquake
复制标题
地震后PF-Ring和PF-AR的运行状况
DOI:
10.1088/1742-6596/425/4/042014
复制
发表时间:
2013
期刊:
影响因子:
--
通讯作者:
M. Yamamoto
中科院分区:
文献类型:
--
作者:
T. Honda;S. Asaoka;K. Haga;K. Harada;Y. Honda;M. Izawa;Y. Kamiya;Y. Kobayashi;T. Miyajima;H. Miyauchi;S. Nagahashi;N. Nakamura;T. Nogami;T. Obina;T. Ozaki;H. Sagehashi;H. Sakai;S. Sakanaka;H. Sasaki;Y. Sato;M. Shimada;K. Shinoe;T. Shioya;M. Tadano;T. Tahara;T. Takahashi;R. Takai;H. Takaki;Y. Tanimoto;K. Tsuchiya;T. Uchiyama;A. Ueda;K. Umemori;M. Yamamoto
In 2011, two SR sources of KEK, PF-ring and PF-AR, needed to change the operation schedule because of the unprecedented earthquake on March 11. Though the injector linac and the storage rings suffered a serious damage, temporary recovery was accomplished quickly and the trial operation started in May. The regular user operation could be resumed in October 2011. In the restoration work after the earthquake, some old vacuum components were removed from PF-ring. This work fortunately brought an effect of settling the quadrupole-mode longitudinal instability. For the top-up injection of PF-ring, the pulsed sextupole magnet has been used instead of the conventional kicker magnets since 2011. The hybrid-fill mode in place of the single-bunch mode has become available. Recently, the 10-Hz orbit switching for the tandem circularly polarized undulators has been developed for the user operation.