Liquid lead flow-accelerated corrosion testing with the rotating cage set-up: A CFD optimisation
Liquid lead flow-accelerated corrosion testing with the rotating cage set-up: A CFD optimisation
复制标题
DOI:
10.1016/j.anucene.2021.108620
复制
发表时间:
2022
影响因子:
1.9
通讯作者:
A. E. Ali;A. Cioncolini;D. Laurence;H. Iacovides
中科院分区:
文献类型:
--
作者:
A. E. Ali;A. Cioncolini;D. Laurence;H. Iacovides