Production control in an ‘engineer-to-order’ environment

Production control in an ‘engineer-to-order’ environment
复制标题

“按订单设计”环境中的生产控制

DOI:
10.1080/09537289108919356
复制
发表时间:
1991
影响因子:
8.3
通讯作者:
L. Gelders
L. Gelders
中科院分区:
管理学3区
文献类型:
--
作者:
L. Gelders

文献摘要

被引文献

相似文献

摘要 “按订单设计”环境中的生产计划和控制提出了具体问题。特别是在制造交货时间较长的复杂产品时,一方面需要类似 MRP 的解决方案,另一方面需要面向项目的计划系统,两者之间存在着冲突的需求。本文描述了这一问题环境,并提出了部门和工厂层面的规划方法。在工厂层面,生产网络用于监控产能负荷、交货时间和预算。详细的日程安排发生在部门级别。讨论了组织问题和结构。
Abstract Production planning and control in an ‘engineer-to-order’ environment raises specific problems. Particularly when complex products with long lead times are manufactured, there are conflicting needs for a MRP-like solution on the one hand, and a project-oriented planning system on the other hand. The paper provides a description of this problem environment, and proposes a planning approach at both departmental and factory levels. At factory level, production networks are used to monitor capacity load, lead-times and budgets. Detailed scheduling occurs at departmental level. Organizational issues and structures arc discussed.