On feasibility boundaries of electrical power grids in steady state
On feasibility boundaries of electrical power grids in steady state
复制标题
稳态电网的可行性边界
DOI:
10.1016/j.ijepes.2009.02.004
复制
发表时间:
2009
影响因子:
5.2
通讯作者:
Rehtanz
中科院分区:
文献类型:
--
作者:
Krause;Lehnhoff;Handschin;Rehtanz
Both the coordination of international energy transfer and the integration of a rapidly growing number of decentralized energy resources (DER) throughout most countries cause novel problems for avoiding voltage band violations and line overloads. Traditional approaches are typically based on global off-line scheduling under globally available information and rely on iterative procedures that can guarantee neither convergence nor execution time. In this paper, we focus on operational limitation problems in power grids based on widely dispersed (renewable) energy sources. We introduce an extension to the DEZENT algorithm, a multi-agent based coordination system for DER, that allows for the feasibility verification in constant and predetermined time. We give a numerical example showing the legitimacy of our approach and mention ongoing and future work regarding its implementation and utilization.
登录
查看更多内容
DOI:
--
发表时间:
2008
期刊:
European Conference on the Engineering of Computer-Based Systems
影响因子:
--
作者:
H. Wedde;S. Lehnhoff;K. Moritz;E. Handschin;O. Krause
通讯作者:
O. Krause
DOI:
--
发表时间:
2008
期刊:
影响因子:
--
作者:
C. Rehtanz;E. Handschin;H. Wedde;O. Krause;S. Lehnhoff
通讯作者:
S. Lehnhoff
DOI:
--
发表时间:
2007
期刊:
2007 5th IEEE International Conference on Industrial Informatics
影响因子:
--
作者:
H. Wedde;Sebastian Lehnhoff;Edmund Handschin;Olav Krause
通讯作者:
Olav Krause
DOI:
--
发表时间:
1986
期刊:
Symposium on the Theory of Computing
影响因子:
--
作者:
R. Seidel
通讯作者:
R. Seidel
DOI:
--
发表时间:
2006
期刊:
Euromicro Conference on Real-Time Systems
影响因子:
--
作者:
H. Wedde;S. Lehnhoff;E. Handschin;O. Krause
通讯作者:
O. Krause