Simulation-based scheduling for photo-reconnaissance satellite
Simulation-based scheduling for photo-reconnaissance satellite
复制标题
基于仿真的照相侦察卫星调度
DOI:
10.1109/wsc.2005.1574555
复制
发表时间:
2005
期刊:
影响因子:
--
通讯作者:
Yingwu Chen
中科院分区:
文献类型:
--
作者:
Qiming Ruan;Yuejin Tan;Renjie He;Yingwu Chen
A simulation-based scheduling mechanism for photo-reconnaissance satellite is presented in this paper. The satellite scheduling problem belongs to a class of single-machine scheduling problems with time window constraint. It is NP-hard in computational complexity. Based on simulation platform, a mixed integer programming model is used to formulate the problem and an advanced tabu algorithm is adopted to solve the MIP. Numerical results demonstrate that this approach is efficient in the scheduling problems.