Lock-up failure of a four-bar linkage deployment mechanism
Lock-up failure of a four-bar linkage deployment mechanism
复制标题
四连杆展开机构锁止失效
DOI:
--
复制
发表时间:
1993
期刊:
影响因子:
--
通讯作者:
M. Zinn
中科院分区:
文献类型:
--
作者:
M. Zinn
A successful failure investigation of a four-bar linkage deployment mechanism has been performed. Possible failure causes such as the mismatch of material coefficient of thermal expansion (CTE), excessive hinge friction, limit switch interference, and thermal gradient induced resistive preload were investigated and are discussed. The final conclusions and corrective actions taken are described. Finally, valuable lessons learned during the investigation are discussed.