Two empirical uncertain models for project scheduling problem

Two empirical uncertain models for project scheduling problem
复制标题

项目调度问题的两个经验不确定模型

DOI:
10.1057/jors.2014.115
复制
发表时间:
2015-09
影响因子:
3.6
通讯作者:
Zhu, Yuanguo
Zhu, Yuanguo
中科院分区:
管理学4区
文献类型:
--
作者:
Ding, Chunxiao;Zhu, Yuanguo

文献摘要

参考文献

被引文献

相似文献

考虑活动工期不确定的项目调度问题,根据不同的管理需求,建立了两类不确定项目调度问题的模型。这些模型被转换为清晰的形式,可以通过经典的优化方法来解决。对于无法转化为清晰形式的模型,采用不确定模拟来逼近不确定函数。最后,给出两个数值例子来说明所提出模型的有用性。
The project scheduling problem with uncertain activity durations is considered, and two types of models for uncertain project scheduling problems are established according to different management requirements. These models are transformed to their crisp forms, which may be solved by classical optimization methods. For the models that could not be transformed to their crisp forms, an uncertain simulation is employed to approximate uncertain functions. Finally, two numerical examples are given to illustrate the usefulness of proposed models.
不确定变量函数和不确定规划
DOI: --
发表时间: 2012
影响因子: --
作者:
Zhu, Yuanguo
通讯作者: Zhu, Yuanguo
DOI: 10.1016/j.ejor.2006.09.055
发表时间: 2007-11
期刊: Eur. J. Oper. Res.
影响因子: --
作者:
Hua Ke;Baoding Liu
通讯作者: Hua Ke;Baoding Liu
DOI: 10.1007/springerreference_5307
发表时间: 2012
期刊: --
影响因子: --
作者:
Y. Z. Mehrjerdi
通讯作者: Y. Z. Mehrjerdi
DOI: --
发表时间: 2008
期刊: --
影响因子: --
作者:
Baoding Liu
通讯作者: Baoding Liu
DOI: 10.1016/j.camwa.2008.05.005
发表时间: 2008-11
期刊: Comput. Math. Appl.
影响因子: --
作者:
C. Chun;B. Neta
通讯作者: C. Chun;B. Neta