The analysis of scheduling rules in a flexible job shop with non-zero setup costs
The analysis of scheduling rules in a flexible job shop with non-zero setup costs
复制标题
非零准备成本的灵活作业车间调度规则分析
DOI:
10.1504/ijtpm.2009.025289
复制
发表时间:
2009
影响因子:
--
通讯作者:
M. K. Bhutta
中科院分区:
文献类型:
--
作者:
F. Huq;Ken Cutright;M. K. Bhutta
This paper evaluates the scheduling of parts in a Flexible Job Shop (FJS) with non-zero setup costs, varying arrival rates and multiple objective functions. The Shortest Processing Time (SPT), Longest Processing Time (LPT), First-in, First-out (FIFO) and Earliest Due Date (EDD) scheduling rules are evaluated with respect to minimising the number of early jobs and optimising the due-date performance while simultaneously approximating Just-in-Time (JIT) inventory levels. We show in this paper that when the setup costs are not zero, depending on which objective is given priority, different machine loading configurations optimise system performance.