Numerical simulation on reasonable position of strike high roadway with FLUENT
Numerical simulation on reasonable position of strike high roadway with FLUENT
复制标题
DOI:
--
复制
发表时间:
2014
期刊:
影响因子:
--
通讯作者:
Lin Haife
中科院分区:
文献类型:
--
作者:
Lin Haife
In order to obtain the optimum position of strike high roadway,the methane degasification and delivery model of strike high roadway in gob was built.The degasification effect of strike high roadway was analyzed with FLUENT software,which layout different horizontal distance to return entry,and the different vertical distance to the roof of coal seam.The results of numerical simulation and practical application show that the degasification effect is best,where is located near the return roadway and upper caving zone,the parallel distance from dip break line is 0.46 times zone width,and the vertical distance from caving zone boundary is 2.8 times mining height.The strike high roadway can eliminate the methane overrun in face,which guarantees the safety of production.