Bridge pier settlement prediction in high-speed railway via autoregressive model based on robust weighted total least-squares
Bridge pier settlement prediction in high-speed railway via autoregressive model based on robust weighted total least-squares
复制标题
基于鲁棒加权总最小二乘自回归模型的高速铁路桥墩沉降预测
DOI:
10.1080/00396265.2016.1236162
复制
发表时间:
2018-03
期刊:
影响因子:
1.6
通讯作者:
Gong X
中科院分区:
文献类型:
--
作者:
Gong X
The autoregressive model for time series prediction is a common method in settlement prediction. In the traditional parameter estimation of autoregressive model, least-squares (LS) is the method, which only considers the errors in the observation vector.
登录
查看更多内容
DOI:
10.11947/j.agcs.2018.20180105
发表时间:
2014
期刊:
--
影响因子:
--
作者:
Gong Xunqiang
通讯作者:
Gong Xunqiang
DOI:
10.1007/b98890
发表时间:
1998
期刊:
--
影响因子:
--
作者:
J. O. Rawlings;S. Pantula;David A. Dickey
通讯作者:
J. O. Rawlings;S. Pantula;David A. Dickey
影响因子:
1.3
作者:
Amiri-Simkooei, A.;Jazaeri, S.
通讯作者:
Jazaeri, S.
影响因子:
8.5
作者:
Kayacan, Erdal;Ulutas, Baris;Kaynak, Okyay
通讯作者:
Kaynak, Okyay
影响因子:
4.4
作者:
Yunzhong Shen;Bofeng Li;Yi Chen
通讯作者:
Yunzhong Shen;Bofeng Li;Yi Chen