Load-frequency control of an interconnected hydro-thermal power system with new area control error considering battery energy storage facility

Load-frequency control of an interconnected hydro-thermal power system with new area control error considering battery energy storage facility
复制标题

考虑电池储能设施的具有新区域控制误差的互联水热发电系统负荷频率控制

DOI:
--
复制
发表时间:
2000
期刊:
影响因子:
--
通讯作者:
D. Das
D. Das
中科院分区:
--
文献类型:
--
作者:
S. Aditya;D. Das

文献摘要

被引文献

相似文献

本文研究了考虑电池储能(BES)系统的互连水热系统的负载频率控制。基于联络功率偏差、频率偏差、时间误差和无意交换(非预定能量转移)的新区域控制误差(ACEN)用于 BES 系统的控制。时域仿真用于研究电力系统和BES系统的性能。结果表明,BES可以满足有功功率负载的突发需求,并且在减少频率峰值偏差、联络功率、时间误差和无意的互换累积方面非常有效。版权所有 © 2000 约翰·威利父子有限公司
This paper deals with load-frequency control of an interconnected hydro-thermal system considering battery energy storage (BES) system. A new area control error (ACEN) based on tie-power deviation, frequency deviation, time error and inadvertent interchange (unscheduled energy transfer) is used for the control of the BES system. Time domain simulations are used to study the performance of the power system and the BES system. Results reveal that BES meets sudden requirements of real power load and is very effective in reducing the peak deviations of frequencies, tie-power, time errors and inadvertent interchange accumulations. Copyright © 2000 John Wiley & Sons, Ltd.