A method for determining the groups of road segments to be constructed, the priority between them and the construction order of road segments within each group considering the disutility under construction
A method for determining the groups of road segments to be constructed, the priority between them and the construction order of road segments within each group considering the disutility under construction
复制标题
一种考虑在建负效用的确定待建设路段组、组间优先级以及组内路段施工顺序的方法
DOI:
10.2208/journalip.13.703
复制
发表时间:
1996
期刊:
影响因子:
--
通讯作者:
T. Chishaki
中科院分区:
文献类型:
--
作者:
Hiroshi Tanoue;M. Kiyota;T. Chishaki
This paper describes two methods to determine the groups of road segments to be constructed, the priority between them and the construction order of road segments within each group considering the disutility under construction. The dynamic programming and stochastic schemata exploiter method are utilized for optimization procedure. The mathematical modeling and solution technique are emphasized. An example problem is included and illustrated for showing the applicability of the proposed methods. The results indicate that the methods are useful for the multi-stage determination problems such as the road network planning.