HIRFL-CSR commissioning in 2006 and 2007
HIRFL-CSR commissioning in 2006 and 2007
复制标题
DOI:
10.1088/1674-1137/33/s2/004
复制
发表时间:
2009-06
影响因子:
3.6
通讯作者:
Xia Jia-Wen;Yuan You-jin;Liu Yong;Yang Jiancheng;Xu Hu-shan;Xiao Guo-qing;Y. Xiaodong;Zhang Wei;Gao Daqing;Zhou Zhongzu;Mao Ruishi;Mao Li-jun;He Yuan;Xu Zhe;Yang Ya-qing;Xiao Chen;Yin Da-yu;Zhao Tie-cheng;Wu Junxia;Li Guo-hong;Li Jie;Li Peng;Li Ke;Hu Zheng-guo
中科院分区:
文献类型:
--
作者:
Xia Jia-Wen;Yuan You-jin;Liu Yong;Yang Jiancheng;Xu Hu-shan;Xiao Guo-qing;Y. Xiaodong;Zhang Wei;Gao Daqing;Zhou Zhongzu;Mao Ruishi;Mao Li-jun;He Yuan;Xu Zhe;Yang Ya-qing;Xiao Chen;Yin Da-yu;Zhao Tie-cheng;Wu Junxia;Li Guo-hong;Li Jie;Li Peng;Li Ke;Hu Zheng-guo
HIRFL-CSR, a new heavy ion cooler-storage-ring system at IMP, had been in commissioning since the beginning of 2006. In the two years of 2006 and 2007 the CSR commissioning was finished, including the stripping injection (STI), electron-cooling with hollow electron beam, C-beam stacking with the combination of STI and e-cooling, the wide energy-range synchrotron ramping from 7 MeV/u to 1000 MeV/u by changing the RF harmonic-number at mid-energy, the multiple multi-turn injection (MMI), the beam accumulation with MMI and e-cooling for heavy-ion beams of Ar, Kr and Xe, the fast extraction from CSRm and single-turn injection to CSRe, beam stacking in CSRe and the RIBs mass-spectrometer test with the isochronous mode in CSRe by using the time-of-flight method.