Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology

Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology
复制标题

成组技术下到期日分配单机调度优化

DOI:
10.1155/2021/6656261
复制
发表时间:
2021
期刊:
影响因子:
2.3
通讯作者:
Wei-Wei Liu
Wei-Wei Liu
中科院分区:
工程技术4区
文献类型:
--
作者:
Li-Yan Wang;Mengqi Liu;Ji-Bo Wang;Yuan-Yuan Lu;Wei-Wei Liu

文献摘要

被引文献

相似文献

研究了同时考虑交货期分配和成组技术的单机调度问题。目标是确定组和组内作业的最优顺序和最优交货期分配,以最小化延误绝对值和交货期分配成本的加权和,其中权重与位置有关。对于普通(CON)到期日作业、松弛(SLK)到期日作业和不同(DIF)到期日作业,不,不。原木。。分别提出了N-时间算法来解决该问题,其中。N是工作岗位的数量。
In this paper, the single-machine scheduling problem is studied by simultaneously considering due-date assignment and group technology (GT). The objective is to determine the optimal sequence of groups and jobs within groups and optimal due-date assignment to minimize the weighted sum of the absolute value in lateness and due-date assignment cost, where the weights are position dependent. For the common (CON) due-date assignment, slack (SLK) due-date assignment, and different (DIF) due-date assignment, an . O. n. . log. . n. time algorithm is proposed, respectively, to solve the problem, where . n. is the number of jobs.