IMPLEMENTING HEADWAY-BASED RELIABILITY CONTROL ON TRANSIT ROUTES
IMPLEMENTING HEADWAY-BASED RELIABILITY CONTROL ON TRANSIT ROUTES
复制标题
DOI:
10.1061/(asce)0733-947x(1990)116:1(49
复制
发表时间:
1990
期刊:
影响因子:
--
通讯作者:
M. Abkowitz;M. Lepofsky
中科院分区:
文献类型:
--
作者:
M. Abkowitz;M. Lepofsky
This paper presents the operational issues and results of implementing real‐time headway‐based reliability control along candidate bus routes operated by the Massachusetts Bay Transportation Authority in 1987. The procedure involves holding buses at a control point on the route until a prescribed minimum headway is achieved. Headway‐based control strategies apply to high‐frequency transit routes where headways are sufficiently short that travelers arrive randomly at bus stops without consulting a schedule. It is considered appropriate for correcting service disruptions that have already occurred, or for preventing propagation and further service degradation. The goal of this effort is to improve service reliability as perceived by travelers, as well as to allow for more effective utilization of operator resources. Failure by street supervisors to consistently follow holding instructions and data collection problems involving point checkers hampered the evaluation effort. Nevertheless, it appears that cert...