Two-step foaming process combined with hot-rolling in fabrication of an aluminium foam sandwich panel
Two-step foaming process combined with hot-rolling in fabrication of an aluminium foam sandwich panel
复制标题
两步发泡结合热轧工艺制备泡沫铝夹芯板
DOI:
10.1016/j.matlet.2020.127427
复制
发表时间:
2020-04-15
影响因子:
3
通讯作者:
Yao, Zhi
中科院分区:
文献类型:
--
作者:
Lu, Xiaotong;Luo, Hongjie;Yao, Zhi
The present study addresses a new aluminium foam sandwich (AFS) manufacturing process by simplifying the technological processes and reducing costs by use of a two-step foaming process and hot-rolling. The interface between the coversheet and precursor core was bonded tightly by four passes of hot-rolling at 480 degrees C to realise simultaneous metallurgical bonding and foaming. The addition of Mg and pre-heated SiC makes the foaming process more stable and increases the apparent viscosity of the melt and decreases the adverse effects of gravity drainage and capillary action. The optimum foaming conditions occurred at a temperature of 720 degrees C for between 270 s and 390 s. (C) 2020 Elsevier B.V. All rights reserved.