Impact of load management on composite system reliability evaluation short-term operating benefits

Impact of load management on composite system reliability evaluation short-term operating benefits
复制标题

DOI:
10.1109/59.867185
复制
发表时间:
2000-05
影响因子:
6.6
通讯作者:
M. Fotuhi‐Firuzabad;R. Billinton
M. Fotuhi‐Firuzabad;R. Billinton
中科院分区:
工程技术1区
文献类型:
--
作者:
M. Fotuhi‐Firuzabad;R. Billinton

文献摘要

被引文献

相似文献

负荷管理(LM)的运营效益通常是在长期研究的基础上计算的,旨在确定负荷管理对静态容量评估或装机容量要求的影响。本文开发了一个福利框架,用于全面评估将可中断负荷实施到需求侧管理的可能场景。该框架考虑了复合系统运行储备评估中的确定性和概率性方面。通过使用可中断负载来减少系统旋转储备,可以实现系统成本节约。由于包含可中断负载而节省了社会成本,研究结果通过应用于 IEEE 可靠性测试系统来呈现。
Operating benefits from load management (LM) are generally calculated on the basis of long-term studies, which are directed toward determining the impact of LM on the static capacity assessment or the installed capacity requirements. A well-being framework is developed in this paper for a comprehensive evaluation of possible scenarios for the implementation of interruptible load into demand-side management. The framework considers both deterministic and probabilistic aspects in composite system operating reserve assessment. System cost saving can be achieved by using interruptible load to reduce system spinning reserve. The saving in societal cost due to inclusion of interruptible load and study results are presented by application to the IEEE Reliability Test System.