ITER 磁体的采购将于 2007 年底/2008 年初开始,届时将推出交货时间最长的物品、Nb3Sn 导体和 TF 线圈绕组。采购的基础设计于 2001 年确定,Cadarache ITER 团队的组建伴随着对 2001 年设计中最关键或最有争议的特征的审查。与此同时,一项紧急研发计划已经启动,以完成对所提出的设计解决方案的必要验证。本文将概述主要设计特征和驱动因素,并总结一些最近的问题和研发成果。
Procurement of the ITER magnets is due to start at the end of 2007/early 2008, with the launch of the longest lead time items, the Nb3Sn conductor and the TF coil windings. The base design for procurement was established in 2001, and the build up of the Cadarache ITER team has been accompanied by a review of the most critical, or controversial, features of the 2001 design. At the same time, an urgent R&D program has been launched to complete the necessary verification of the design solutions that are proposed. In this paper an overview will be presented of the main design features and drivers, and some of the recent issues and R&D results will be summarized.