Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
复制标题
DOI:
10.1057/jors.1995.122
复制
发表时间:
1995-07
影响因子:
3.6
通讯作者:
A. Allahverdi
中科院分区:
文献类型:
--
作者:
A. Allahverdi
The problem of scheduling a two-machine flowshop, where set-up times are considered as separate from processing times and machines suffer random breakdowns, is addressed with respect to the makespan objective. A dominance relation for minimizing makespan with probability 1 is established. Furthermore, it is shown that Yoshida and Hitomi's algorithm for the deterministic problem stochastically minimizes makespan when random breakdowns are present.