PRESENT STATUS OF THE KEK ELECTRON / POSITRON INJECTOR LINAC

PRESENT STATUS OF THE KEK ELECTRON / POSITRON INJECTOR LINAC
复制标题

KEK 电子/正电子注入直线加速器的现状

DOI:
--
复制
发表时间:
2012
期刊:
影响因子:
--
通讯作者:
T. Miura
T. Miura
中科院分区:
--
文献类型:
--
作者:
T. Miura

文献摘要

被引文献

相似文献

在KEK电子/正电子注入器直线加速器中,电子束已经通过下游的三个扇区输送到光子工厂(PF、PFAR)。在2011财年,直线加速器在快速恢复后运行了5492小时,运行状况相当良好。在上游的五个领域,地震后的恢复工作正在进行中。为SuperKEKB提供大电流和低发射度束流的升级工作也在继续。
In the KEK electron/positron injector linac, the electron beam has been delivered to the photon factories (PF, PFAR) using three sectors downstream. In FY2011, the linac was operated reasonably well for 5492 hours after the quick restoration. In five sectors upstream, the recovery efforts after the earthquake are underway. The upgrade efforts to supply high-current and low-emittance beams for SuperKEKB also have been continued.