PERFORMANCE OF THE BEPC AND PROGRESS OF THE BEPCII
PERFORMANCE OF THE BEPC AND PROGRESS OF THE BEPCII
复制标题
DOI:
10.1142/9789812702227_0196
复制
发表时间:
2005-05
期刊:
影响因子:
--
通讯作者:
Chuan Zhang
中科院分区:
文献类型:
--
作者:
Chuan Zhang
The performance of the Beijing Electron-Positron Collider (BEPC) and plans of its second phase construction, i.e. the BEPCII, are reported. The BEPC has been well operated for 15 years with many exciting high energy physics and synchrotron radiation research results since it was put into operation in 1989. As the natural extension of the BEPC, the BEPCII project has started its construction since the beginning of 2004. The design luminosity of the BEPCII is 1×10 33 cm -2 s -1 at 1.89 GeV with a double-ring structure. The performance of the BEPCII as a synchrotron radiation source will also be improved with the expected beam current of 250mA at 2.5 GeV. Some key technologies are being developed in order to achieve the goal of the project.