Coke production scheduling problem: A parallel machine scheduling with batch preprocessings and location-dependent processing times
Coke production scheduling problem: A parallel machine scheduling with batch preprocessings and location-dependent processing times
复制标题
焦炭生产调度问题:具有批量预处理和位置相关处理时间的并行机器调度
DOI:
10.1016/j.cor.2018.12.002
复制
发表时间:
2019-04
影响因子:
4.6
通讯作者:
Chengbin Chu
中科院分区:
文献类型:
--
作者:
Ming Liu;Feng Chu;Junkai He;Dapeng Yang;Chengbin Chu
In this paper, an integer programming model is developed for a newly addressed coke production scheduling problem, in which two typical characteristics are considered: (i) The transportation of raw coal by a vehicle causes a batch preprocessing; (ii) The heating of raw coal by closely located coke ovens may extend the processing times of cokes, under the temperature influence. To the best of our knowledge, such a geographically location-dependent processing time has not been studied. The purpose is to minimize the completion time of the last coke among all ovens, i.e., the makespan. Therefore, the problem of interest can be viewed as a parallel machine makespan minimization scheduling problem, featured with batch preprocessings and location-dependent processing times. For this NP-hard problem, a problem-specific genetic algorithm and a fast heuristic are devised to enhance the computational efficiency. Experimental results on 330 randomly generated instances show the effectiveness and efficiency of the proposed solution methods.
登录
查看更多内容
影响因子:
3.6
作者:
Alidaee, B;Womer, NK
通讯作者:
Womer, NK
DOI:
10.1007/978-3-642-41880-8
发表时间:
2014-01
期刊:
--
影响因子:
--
作者:
A. Agnetis;J. Billaut;Stanisław Gawiejnowicz;D. Pacciarelli;A. Soukhal
通讯作者:
A. Agnetis;J. Billaut;Stanisław Gawiejnowicz;D. Pacciarelli;A. Soukhal
影响因子:
9.2
作者:
M. Yadollahi;I. Mahdavi;M. Paydar;J. Jouzdani
通讯作者:
M. Yadollahi;I. Mahdavi;M. Paydar;J. Jouzdani
影响因子:
3.6
作者:
Bachman, A;Janiak, A
通讯作者:
Janiak, A
影响因子:
4.8
作者:
Stanisław Gawiejnowicz;A. Kononov
通讯作者:
Stanisław Gawiejnowicz;A. Kononov