Cyclic scheduling of a hoist with time window constraints
Cyclic scheduling of a hoist with time window constraints
复制标题
DOI:
10.1109/70.660860
复制
发表时间:
1998-02
期刊:
影响因子:
--
通讯作者:
Haoxun Chen;C. Chu;J. Proth
中科院分区:
文献类型:
--
作者:
Haoxun Chen;C. Chu;J. Proth
This paper proposes a model and a related algorithm for generating optimal cyclic schedules of hoist moves with time window constraints in a printed circuit board (PCB) electroplating facility. The algorithm is based on the branch and bound approach and requires the solution of a specific class of linear programming problems (LPP). These LPP are equivalent to the problems of the cycle time evaluation in bi-valued graphs. Computational experience is presented to compare the results obtained using this new algorithm with the ones proposed in the literature.