Ship Routing and Scheduling Problem for Steel Plants Cluster alongside the Yangtze
Ship Routing and Scheduling Problem for Steel Plants Cluster alongside the Yangtze
复制标题
长江沿岸钢厂群船舶航线与调度问题
DOI:
10.1016/j.tre.2018.12.001
复制
发表时间:
2019
期刊:
影响因子:
--
通讯作者:
Jinxian Weng
中科院分区:
文献类型:
--
作者:
Feng Li;Dong Yang;Shuaian Wang;Jinxian Weng
This paper aims to provide an optimal shipping schedule for steel-manufacturing plants cluster alongside the Yangtze River by developing a mixed integer programming formulation. The model takes into account the multi-layer shipping network on the Yangtze River, the dynamic iron ore price and transportation costs, and the timely demands of steel plants over multiple periods. By applying the proposed model to a real-world case, several interesting findings are observed, leading to further useful managerial insights. We also propose an exact solution approach based on a dynamic programming algorithm to a special case of this problem motivated by real-world practice.