Short‐term effects of highway construction on the limnology of a small stream in southern Ontario*
Short‐term effects of highway construction on the limnology of a small stream in southern Ontario*
复制标题
高速公路建设对安大略省南部一条小溪湖泊学的短期影响*
DOI:
10.1111/j.1365-2427.1977.tb01661.x
复制
发表时间:
1977
影响因子:
2.7
通讯作者:
B. Barton
中科院分区:
文献类型:
--
作者:
B. Barton
SUMMARY. A limnological investigation was carried out to document the effects of constructing a modern highway across a small stream in southern Ontario. During construction, suspended solids increased to as high as 1390 mg/l but later returned to pre-construction levels of <5 mg/l. Similarly, sediment deposition increased ten-fold to 0. 61 g dry wt/cm2. day directly below the construction site during stream rechannelization after completion of the culvert. Decreased proportion of organic matter in sediments indicated that they came from the construction site. Sediments were readily removed by spates and apparently settled out in downstream ponds. There was no change in water chemistry. Standing crop of fish was reduced from 24 to 10 kg/ha immediately below the site. This decrease did not occur further downstream and fish populations at the affected site returned to original levels after construction. No change in numbers of riffle macroinvertebrates was observed during or after construction. However, there was a noticeable shift in species composition. Invertebrates present during construction activities may have remained in sheltered areas avoiding sedimentation effects. Evidence from invertebrate sampling in denuded areas around the site strongly suggests that organisms which may have been removed during construction were replaced quickly by drift.