A MULTIHOIST MODEL FOR THE REAL TIME HOIST SCHEDULING PROBLEM

A MULTIHOIST MODEL FOR THE REAL TIME HOIST SCHEDULING PROBLEM
复制标题

实时提升机调度问题的多提升机模型

DOI:
--
复制
发表时间:
2007
期刊:
影响因子:
--
通讯作者:
J. Delmas
J. Delmas
中科院分区:
--
文献类型:
--
作者:
J. Lamothe;C. Thierry;J. Delmas

文献摘要

被引文献

相似文献

在多产品提升机调度问题(电镀设备提升机动作调度)中,提出了一种实时优化生产线生产率的方法。在考虑实时上下文时,每当有新作业到达时,就必须计算整个作业的新调度。这种局部问题被称为动态提升机调度问题(DHSP)。在b[5]中提出了一种在每个DHSP中优化一个准则的方法。本文的目的是将先前的结果推广到多提升机调度问题。
This paper presents a real time approach for optimizing the production rate of a line in the field of multiproduct Hoist Scheduling Problem (scheduling of the moves of a hoist in electroplating facilities). As a real time context is considered, any time a new job arrives, a new schedule of the whole jobs has to be computed. This local problem is referred as the Dynamic Hoist Scheduling Problem (DHSP). An approach that consists in optimizing a criterion in each DHSP has been proposed in [5]. This paper objective is to extend those previous results to a multihoist scheduling problem.