A Branch and Bound Algorithm to Minimize Makespan on Identical Parallel Machines with Consumable Resources
A Branch and Bound Algorithm to Minimize Makespan on Identical Parallel Machines with Consumable Resources
复制标题
一种在具有可消耗资源的相同并行机器上最小化完工时间的分支定界算法
DOI:
--
复制
发表时间:
2012
期刊:
影响因子:
--
通讯作者:
Z. Sari
中科院分区:
文献类型:
--
作者:
F. Belkaid;Fouad Maliki;F. Boudahri;Z. Sari
In this paper, we study a scheduling problem for minimizing the makespan on identical parallel machines with consumable resources in a node of a supply chain. The goal is to provide a first exact approach to this problem through the use of Branch and Bound method. We propose two new heuristics and apply other with a series of lower bounds that are incorporated into our algorithm. We tested a large number of randomly generated instances that allow us to compare the computation time and quality of lower bounds and heuristics.