Survey and alignment of SLC's B-factory

Survey and alignment of SLC's B-factory
复制标题

DOI:
10.1109/pac.1997.753378
复制
发表时间:
1997-05
期刊:
Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)
影响因子:
--
通讯作者:
M. Pietryka;M. Gaydosh
M. Pietryka;M. Gaydosh
中科院分区:
其他
文献类型:
--
作者:
M. Pietryka;M. Gaydosh

文献摘要

被引文献

相似文献

SLAC的B-Factory注射器和高能环的勘测和校准工作将于1997年3月完成。现代数字电子测量工具正在为新的、高效的对准程序做出贡献。一台激光跟踪器被用来对近300个四极磁铁进行信任化。数字水准仪被用来预置底板标高。带有非常精确的同轴测距仪的经纬仪被用于从布局到3D磁铁定位再到网络测量的一切,所有这些都是在自由站位模式下进行的。概述了一些程序和测量结果。
The survey and alignment of SLAC's B-factory injector and high energy ring will be complete in March 1997. Modern digital electronic surveying tools are contributing to new, efficient alignment procedures. A laser tracker was used to fiducialize almost 300 quadrupole magnets. Digital levels were used to pre-set base plate elevations. Theodolites with very accurate co-axial distance meters were used for everything from layout to 3D magnet positioning to network surveys, all in free stationing mode. A number of procedures and measurement results are outlined.