Survey and alignment of SLC's B-factory
Survey and alignment of SLC's B-factory
复制标题
DOI:
10.1109/pac.1997.753378
复制
发表时间:
1997-05
期刊:
影响因子:
--
通讯作者:
M. Pietryka;M. Gaydosh
中科院分区:
文献类型:
--
作者:
M. Pietryka;M. Gaydosh
The survey and alignment of SLAC's B-factory injector and high energy ring will be complete in March 1997. Modern digital electronic surveying tools are contributing to new, efficient alignment procedures. A laser tracker was used to fiducialize almost 300 quadrupole magnets. Digital levels were used to pre-set base plate elevations. Theodolites with very accurate co-axial distance meters were used for everything from layout to 3D magnet positioning to network surveys, all in free stationing mode. A number of procedures and measurement results are outlined.