Performance evaluations of a geothermal power plant
Performance evaluations of a geothermal power plant
复制标题
DOI:
10.1016/j.applthermaleng.2011.08.013
复制
发表时间:
2011-12
影响因子:
6.4
通讯作者:
C. Coskun;Z. Oktay;I. Dincer
中科院分区:
文献类型:
--
作者:
C. Coskun;Z. Oktay;I. Dincer
Thermodynamic analysis of an operational 7.5 MWe binary geothermal power plant in Tuzla-Turkey is performed, through energy and exergy, using actual plant data to assess its energetic and exergetic performances. Eight performance-related parameters, namely total exergy destruction ratio, component exergy destruction ratio, dimensionless exergy destruction, energetic renewability ratio, exergetic renewability ratio, energetic reinjection ratio, exergetic reinjection ratio and improvement potential are investigated. Energy and exergy losses/destructions for the plant and its units are determined and illustrated using energy and exergy flow diagrams. The largest energy and exergy losses occur in brine reinjection unit. The variation of the plant energy efficiency is found between 6% and 12%. Exergy efficiency values change between 35 and 49%. The annual average energy and exergy efficiencies are found as 9.47% and 45.2%, respectively.