Re-scheduling in railway networks
Re-scheduling in railway networks
复制标题
DOI:
10.1109/ukci.2013.6651326
复制
发表时间:
2013-10
期刊:
影响因子:
--
通讯作者:
Wei Fang;Jun Sun;Xiaojun Wu;X. Yao
中科院分区:
文献类型:
--
作者:
Wei Fang;Jun Sun;Xiaojun Wu;X. Yao
Railway transport is one of the convenient public transports, known for its safety, reliability of service, and punctuality. Railway networks, as an important part of railway infrastructure, have been extended in the scale and complexity to meet constantly increasing demand of passengers and goods transports. Since railway networks face disturbances more frequently than before as a result of severe weather conditions, signal faults, and increased demand etc., highly efficient re-scheduling approaches are needed to help train dispatchers to re-schedule trains. Many re-scheduling approaches in railway networks have been proposed considering different disturbances scenarios. These approaches are classified by their characteristics and reviewed in detail in this paper. Since re-scheduling problem is usually formulated by different models in the literature, these models are also reviewed along with the approaches. Conclusions and future work on the re-scheduling approaches are given at the end.