An application of Branch and Cut to open pit mine scheduling
An application of Branch and Cut to open pit mine scheduling
复制标题
DOI:
10.1023/a:1024835022186
复制
发表时间:
2003-11-01
影响因子:
1.8
通讯作者:
Hill, SP
中科院分区:
文献类型:
--
作者:
Caccetta, L;Hill, SP
The economic viability of the modern day mine is highly dependent upon careful planning and management. Declining trends in average ore grades, increasing mining costs and environmental considerations will ensure that this situation will remain in the foreseeable future. The operation and management of a large open pit mine having a life of several years is an enormous and complex task. Though a number of optimization techniques have been successfully applied to resolve some important problems, the problem of determining an optimal production schedule over the life of the deposit is still very much unresolved. In this paper we will critically examine the techniques that are being used in the mining industry for production scheduling indicating their limitations. In addition, we present a mixed integer linear programming model for the scheduling problems along with a Branch and Cut solution strategy. Computational results for practical sized problems are discussed.