A study on PGEP to evolve heuristic rules for FJSSP considering the total cost of energy consumption and weighted tardiness

A study on PGEP to evolve heuristic rules for FJSSP considering the total cost of energy consumption and weighted tardiness
复制标题

考虑能源消耗总成本和加权迟到的 PGEP 演化 FJSSP 启发式规则的研究

DOI:
10.1007/s40314-019-0934-1
复制
发表时间:
2019-10
影响因子:
2.6
通讯作者:
ShaqingZhangJunruiZhongHaidongYangZhantaoLiGuoshen
ShaqingZhangJunruiZhongHaidongYangZhantaoLiGuoshen
中科院分区:
数学4区
文献类型:
--
作者:
ShaqingZhangJunruiZhongHaidongYangZhantaoLiGuoshen

文献摘要

参考文献

相似文献

Performance indicators such as makespan, flow time and tardiness are considered to be optimisation objectives in the traditional flexible job shop scheduling problem (FJSSP). However, the cost of energy consumption or environmental problems should not be
DOI: 10.1093/pcmedi/pbac012
发表时间: 2022-05-13
影响因子: 5.3
作者:
通讯作者: --
DOI: 10.1142/s0129183102002912
发表时间: 2002
影响因子: 1.9
作者:
Y. Hardy;W. Steeb
通讯作者: Y. Hardy;W. Steeb
DOI: 10.1016/j.cirp.2010.03.004
发表时间: 2010
影响因子: 4.1
作者:
S. Kara;S. Manmek;C. Herrmann
通讯作者: S. Kara;S. Manmek;C. Herrmann
DOI: --
发表时间: 2012
期刊: Computer Engineering and Applications
影响因子: --
作者:
Qiu Jingwei
通讯作者: Qiu Jingwei
DOI: 10.1016/j.cirp.2014.03.011
发表时间: 2014
影响因子: 4.1
作者:
Hao Zhang;Fu Zhao;K. Fang;J. Sutherland
通讯作者: Hao Zhang;Fu Zhao;K. Fang;J. Sutherland